MOQ: | 1000 |
Price: | 0.1-3USD |
CPVC Fittings:
1. What is CPVC?
Chlorinated Polyvinyl Chloride (CPVC) is a thermoplastic polymer used in piping systems, known for its ability to withstand higher temperatures and pressures compared to PVC. It is chlorinated to enhance heat resistance and durability.
2. Applications
- Hot & Cold Water Distribution: Common in residential/commercial plumbing.
- Industrial Systems: Resists corrosive chemicals, acids, and bases.
- Fire Sprinklers: Non-flammable and handles high temperatures.
- HVAC Systems: For hot water lines and condensate drainage.
3. Key Features
- Temperature Resistance: Up to 200°F (93°C) for water applications.
- Pressure Ratings: Varies by schedule (e.g., Schedule 40: 400 psi @ 73°F; Schedule 80: higher pressure tolerance).
- Corrosion & Chemical Resistance: Suitable for harsh environments.
- Joining Method: Solvent cement (specific to CPVC, not interchangeable with PVC cement).
4. Types of Fittings
- Couplings: Connect two pipes.
- Elbows: 90° or 45° for directional changes.
- Tees: Split or combine flow.
- Reducers: Connect pipes of different sizes.
- Unions: Allow easy disassembly.
- Caps/Adapters: End pipes or transition to other materials (e.g., metal).
5. Standards & Compliance
- ASTM D2846: Governs CPVC piping systems.
- NSF/ANSI 61: Certified for potable water safety.
- Building Codes: Complies with international plumbing codes (IPC, UPC).
6. Advantages
- Cost-Effective: Cheaper than metal (e.g., copper) and easier to install.
- Lightweight & Durable: No corrosion, scaling, or pitting.
- Low Maintenance: Long lifespan with minimal upkeep.
7. Limitations
- UV Sensitivity: Brittle if exposed to sunlight; requires protection outdoors.
- Thermal Expansion: Higher than metal pipes; may need expansion loops.
- Compatibility: Use CPVC-specific cement; transitions to PVC require approved adapters.
8. Installation Tips
- Cutting/Preparation: Use a fine-tooth saw, deburr edges.
- Primer/Cement: Apply CPVC-approved solvent cement; primer may be optional.
- Curing Time: Follow manufacturer guidelines (typically 15 mins–24 hrs).
- Safety: Work in ventilated areas; avoid skin contact with cement.
9. Common Issues & Solutions
- Threaded Connections: Avoid over-tightening; use thread sealant.
- Chemical Compatibility: Verify resistance charts for industrial use.
- Transitioning Materials: Use dielectric unions for metal-CPVC connections to prevent galvanic corrosion.
10. Sizing & Variants
- Sizes: ½" to 12" diameters, depending on application.
- Types: Threaded (for metal interfaces) vs. slip (solvent-welded).
12. Maintenance
- Inspect for leaks, physical damage, or UV degradation.
- Replace discolored/brittle sections promptly.
Conclusion
CPVC fittings offer a versatile, economical solution for hot water and chemical systems. Proper installation and adherence to standards ensure longevity and safety. Always use compatible materials and consult specifications for temperature/pressure requirements.
Name | Coupling |
Description | CPVC CTS MALE THREAD ADAPTER, SOCKET MPT |
Material | CPVC |
Standard | ASTM D2846 |
Color | Cream, Yellow |
Application | Hot water |
MAX. Temperature | 110℃ |
connection method | cpvc glue, cpvc solvent cement |
Certification | NSF, CE, ISO |
OEM/ODM | Accept |
Packing | Carton or plastic bag, details depend on customer |
Delivery Time | Average around 45 Days, After Seller Received Deposit. |
Port of Loading | NINGBO |
1. Do you offer OEM service?
♦Yes. We have our famous brand name. But we can offer OEM service also, with same quality. We can review and accept customer design, or design based on customer requirements, by our professional R&D team.
2.Why Choose Us?
♦Trust in our experience.
We supply many different standards professional products for more than 60 countries and areas in the world.
♦Trust in our authority.
We had many professional inspections and certificates. We had passed inspections of CE, NSF, SGS, and get the certificates of ISO 9001, ISO 14001, OHSAS 18001, and WRAS, and so on.
♦Trust in our solutions.
We have professional R&D team, QA&QC team, marketing team. We have many patents and awards, can supply highest quality OEM products, and help you and do with you to settle any kind of logistical problems.
MOQ: | 1000 |
Price: | 0.1-3USD |
CPVC Fittings:
1. What is CPVC?
Chlorinated Polyvinyl Chloride (CPVC) is a thermoplastic polymer used in piping systems, known for its ability to withstand higher temperatures and pressures compared to PVC. It is chlorinated to enhance heat resistance and durability.
2. Applications
- Hot & Cold Water Distribution: Common in residential/commercial plumbing.
- Industrial Systems: Resists corrosive chemicals, acids, and bases.
- Fire Sprinklers: Non-flammable and handles high temperatures.
- HVAC Systems: For hot water lines and condensate drainage.
3. Key Features
- Temperature Resistance: Up to 200°F (93°C) for water applications.
- Pressure Ratings: Varies by schedule (e.g., Schedule 40: 400 psi @ 73°F; Schedule 80: higher pressure tolerance).
- Corrosion & Chemical Resistance: Suitable for harsh environments.
- Joining Method: Solvent cement (specific to CPVC, not interchangeable with PVC cement).
4. Types of Fittings
- Couplings: Connect two pipes.
- Elbows: 90° or 45° for directional changes.
- Tees: Split or combine flow.
- Reducers: Connect pipes of different sizes.
- Unions: Allow easy disassembly.
- Caps/Adapters: End pipes or transition to other materials (e.g., metal).
5. Standards & Compliance
- ASTM D2846: Governs CPVC piping systems.
- NSF/ANSI 61: Certified for potable water safety.
- Building Codes: Complies with international plumbing codes (IPC, UPC).
6. Advantages
- Cost-Effective: Cheaper than metal (e.g., copper) and easier to install.
- Lightweight & Durable: No corrosion, scaling, or pitting.
- Low Maintenance: Long lifespan with minimal upkeep.
7. Limitations
- UV Sensitivity: Brittle if exposed to sunlight; requires protection outdoors.
- Thermal Expansion: Higher than metal pipes; may need expansion loops.
- Compatibility: Use CPVC-specific cement; transitions to PVC require approved adapters.
8. Installation Tips
- Cutting/Preparation: Use a fine-tooth saw, deburr edges.
- Primer/Cement: Apply CPVC-approved solvent cement; primer may be optional.
- Curing Time: Follow manufacturer guidelines (typically 15 mins–24 hrs).
- Safety: Work in ventilated areas; avoid skin contact with cement.
9. Common Issues & Solutions
- Threaded Connections: Avoid over-tightening; use thread sealant.
- Chemical Compatibility: Verify resistance charts for industrial use.
- Transitioning Materials: Use dielectric unions for metal-CPVC connections to prevent galvanic corrosion.
10. Sizing & Variants
- Sizes: ½" to 12" diameters, depending on application.
- Types: Threaded (for metal interfaces) vs. slip (solvent-welded).
12. Maintenance
- Inspect for leaks, physical damage, or UV degradation.
- Replace discolored/brittle sections promptly.
Conclusion
CPVC fittings offer a versatile, economical solution for hot water and chemical systems. Proper installation and adherence to standards ensure longevity and safety. Always use compatible materials and consult specifications for temperature/pressure requirements.
Name | Coupling |
Description | CPVC CTS MALE THREAD ADAPTER, SOCKET MPT |
Material | CPVC |
Standard | ASTM D2846 |
Color | Cream, Yellow |
Application | Hot water |
MAX. Temperature | 110℃ |
connection method | cpvc glue, cpvc solvent cement |
Certification | NSF, CE, ISO |
OEM/ODM | Accept |
Packing | Carton or plastic bag, details depend on customer |
Delivery Time | Average around 45 Days, After Seller Received Deposit. |
Port of Loading | NINGBO |
1. Do you offer OEM service?
♦Yes. We have our famous brand name. But we can offer OEM service also, with same quality. We can review and accept customer design, or design based on customer requirements, by our professional R&D team.
2.Why Choose Us?
♦Trust in our experience.
We supply many different standards professional products for more than 60 countries and areas in the world.
♦Trust in our authority.
We had many professional inspections and certificates. We had passed inspections of CE, NSF, SGS, and get the certificates of ISO 9001, ISO 14001, OHSAS 18001, and WRAS, and so on.
♦Trust in our solutions.
We have professional R&D team, QA&QC team, marketing team. We have many patents and awards, can supply highest quality OEM products, and help you and do with you to settle any kind of logistical problems.